Case Studies

Simons Group – Waterside Shopping Centre

Overview: Simons Group were appointed to refurbish the Waterside Shopping Centre – a large retail unit with restricted access to the building due to the adjacent canal. The Lincoln based project required a new three-storey atrium with escalators and an elevator. Our Solution: Waldeck were appointed as structural engineers for... View Article

Read article

Premier Foods – Food Manufacturing Facility

As part of our Civil and Structural engineering design scope within the project, Waldeck carried out specialist concrete condition survey as well as design works for new walls, food-safe panels, a liquid membrane roofing system, new floors with resin finishes, and drains.

Overview: Our client required the refurbishment and remodelling of an existing fifty year old 1,000,000 square foot derelict facility which has a reinforced concrete barrel vaulted roof constructed by Christiani & Nielson in 1957. Our Solution: As part of our civil and structural engineering design scope within the project, Waldeck... View Article

Read article

Skanska – New Build Workshop Facility

Overview: Working on behalf of our client, the project consisted of a major modernisation of an existing specialist piling and ground works site. The works involved the construction of a new purpose build 3,800m square engineering manufacturing workshop facility including bespoke spray facilities, a 1950m square two storey design and... View Article

Read article

Automotive Manufacturer – Vehicle Operations Facility

Overview: The building of a new vehicle operations facility took place at an existing site of one of Waldeck’s automotive clients. The new facility, comprising of 180 workshop bays and a specialist paint shop for the production of high-end vehicles, is just one of the many sites and projects Waldeck... View Article

Read article

Peel Ports – Development Masterplanning

Overview: Our clients ambitious plans to develop the former site were granted by Local Council in late 2016. The plans for the redevelopment of the site, are part of a 20-year Master Plan for growth and investment in the region, which received unanimous support from the planning committee. Our Solution: Waldeck... View Article

Read article