Galliford Try

Pedestrian Flow for Perry Barr Station

A major redevelopment has taken place at the existing Perry Barr Station in Birmingham as part of the regeneration of the surrounding area.

Waldeck were the lead design organisation providing full multi-disciplinary services on the scheme for Galliford Try who are the main contractor. As part of our involvement on the project, our team provided Pedestrian Flow Modelling.

Network Plus

Digital Capture of Power Infrastructure Vegetation

Our team were approached by Network Plus to undertake a proof-of-concept project, leveraging digital capture technology to aid in the management of vegetation around key power infrastructure.

CPMS

Southend Airport Baggage Handling Facility

Waldeck were appointed by CPMS to carry out the Detailed Design, Construction Information and Digital Capture for an extension to the Baggage Handling System at Southend Airport.

Galliford Try

Perry Barr Station

A major redevelopment is taking place at the existing Perry Barr Station, led by Transport for West Midlands and West Midlands Rail Executive. The new station replaces the old, tired building, which suffered from poor access and a lack of facilities.

Network Rail

Panoptic Bridge Management

Working collaboratively with Network Rail’s R&D team and our partner, Nottingham Trent University, we have developed means to digitalise masonry bridge condition inspections.

Horizon Nuclear

Wylfa Newydd Nuclear Power Station

Waldeck were appointed by Horizon Nuclear Power to provide Strategic BIM Support on the Nuclear new build project which was being developed on the Wylfa Newydd site, on the Isle of Anglesey, Wales.

EDF Energy

Digital Capture of Sizewell C

As part of EDF’s proposed new nuclear power station, Sizewell C in Suffolk, Waldeck’s Digital Capture were appointed to undertake surveys of the surrounding areas.

University of Huddersfield

Digital Capture of Materials

Our Digital Capture team were appointed to survey and capture the site of a new-build educational facility in the North West of England.

Confidential Logistics Client

Digital Capture Survey

Our Digital Capture team were commissioned to carry out an aerial survey of our clients Port, to help them with the leveling out of the area to facilitate the storage of new cars and vans.

EDF Energy

Hinkley Point C Power Station

Waldeck were appointed on EDF Energy’s engineering framework for Hinkley Point C in 2014, functioning as engineering specialist and project management consultancy.

Bombardier

Old Oak Common Rail Depot

Waldeck were appointed by Bombardier to provide a full multi-disciplinary technical peer review for Bombardier as well as Architectural, Civil and Structural Engineering and Mechanical and Electrical Building Services Design support.

Confidential Logistics Client

Digital Dilapidation Survey

Waldeck were appointed to digitally capture the condition of an existing warehouse site for our confidential logistics client.