Fortem
Larwood House, Independent Living Centre Refurbishment
Waldeck provided a multi-disciplinary service working with Fortem to deliver a refurbishment of an independent living centre on the outskirts of Worksop for Bassetlaw District Council.
Galliford Try
Pedestrian Flow for Perry Barr Station
A major redevelopment has taken place at the existing Perry Barr Station in Birmingham as part of the regeneration of the surrounding area.
Waldeck were the lead design organisation providing full multi-disciplinary services on the scheme for Galliford Try who are the main contractor. As part of our involvement on the project, our team provided Pedestrian Flow Modelling.
Dales Marine Services Ltd
DIGITAL CAPTURE OF TWO PILOT BOATS
Waldeck were appointed by Dales Marine Services Ltd to produce accurate 3D layouts of two pilot boats to support their upcoming engine refits.
Network Plus
Digital Capture of Power Infrastructure Vegetation
Our team were approached by Network Plus to undertake a proof-of-concept project, leveraging digital capture technology to aid in the management of vegetation around key power infrastructure.
CPMS
Southend Airport Baggage Handling Facility
Waldeck were appointed by CPMS to carry out the Detailed Design, Construction Information and Digital Capture for an extension to the Baggage Handling System at Southend Airport.
Galliford Try
Perry Barr Station
A major redevelopment is taking place at the existing Perry Barr Station, led by Transport for West Midlands and West Midlands Rail Executive. The new station replaces the old, tired building, which suffered from poor access and a lack of facilities.
Network Rail
Panoptic Bridge Management
Working collaboratively with Network Rail’s R&D team and our partner, Nottingham Trent University, we have developed means to digitalise masonry bridge condition inspections.
STS Aviation Services
Aircraft Hangar Digital Capture & Modelling
The teams at Waldeck and sister company, Morson Projects, collaborated to assist our client, STS Aviation Services, in understanding the operational capacity of one of their aircraft hangars.
Peel Ports
Port of Sheerness Redesign
Waldeck were appointed by Peel Ports to support them with the redevelopment of the Royal Bridge Pontoon area of the Port of Sheerness.
Greencore Group
Maintenance Walkway Refurbishment
Waldeck were appointed by Greencore Group to design and engineer a new maintenance walkway within the roof of one of their manufacturing facilities.
EDF Energy
Digital Capture of Sizewell C
As part of EDF’s proposed new nuclear power station, Sizewell C in Suffolk, Waldeck’s Digital Capture were appointed to undertake surveys of the surrounding areas.
University of Huddersfield
Digital Capture of Materials
Our Digital Capture team were appointed to survey and capture the site of a new-build educational facility in the North West of England.